Restoration

Polaris + Pomin Restoration Feasibility Study 

The Polaris-Burton Creek wetland complex was once one of the largest wetlands on the north shore of Lake Tahoe. Placement of fill for a fish hatchery, athletic fields, campgrounds and a boat ramp, combined with dredging for residential and recreational development, has left the complex in a fragmented state, with severely impaired functions and values. While [...]

Polaris + Pomin Restoration Feasibility Study 2023-04-18T23:21:25+00:00

East Fork Carson River Fish Barrier Feasibility Study 

Trout Unlimited (TU), the California Department of Fish and Wildlife (CDFW), the National Fish and Wildlife Foundation (NFWF) and other resource management entities are working toward Lahontan cutthroat trout (LCT) recovery in the Lahontan Basin. As part of this effort, Balance Hydrologics was hired to evaluate the feasibility of implementing a physical barrier on [...]

East Fork Carson River Fish Barrier Feasibility Study 2023-04-14T22:10:09+00:00

Meeks Bay Restoration Hydrology and Geomorphology

The Meeks Bay Restoration Project is an effort to restore geomorphic and hydrologic functions to Meeks Creek and its lagoon at Lake Tahoe while continuing to support sustainable recreation opportunities. The effort is being led by the U.S. Forest Service Lake Tahoe Basin Management Unit (LTBMU), and in collaboration with the Tahoe Regional Planning [...]

Meeks Bay Restoration Hydrology and Geomorphology2023-04-13T00:07:38+00:00

Carmel River Reroute and Dam Removal

California American Water (CAW), the State Coastal Conservancy (SCC) and California Department of Fish and Wildlife (CDFW), the project owners, cooperatively removed the San Clemente Dam on the Carmel River, Monterey County, California.  San Clemente Dam was 106 feet tall and constructed in 1921.  After more than 10 years of alternatives analysis, dam removal [...]

Carmel River Reroute and Dam Removal2020-04-27T22:37:43+00:00

Sardine Meadow Restoration Design

The Truckee River Watershed Council (TRWC) partnered with the Trust for Public Land (TPL) and the U.S. Forest Service Tahoe National Forest (TNF) to restore Sardine Meadow, a 900-acre meadow located in the Davies Creek watershed.  Extensive historical disturbance resulted from road and railroad construction for logging and milling operations.  More recent ranching activity [...]

Sardine Meadow Restoration Design2020-03-28T01:03:21+00:00

Upper Penitencia Creek Mitigation and Restoration Design for BART to San Jose

Balance Hydrologics was retained to prepare a complete set of construction documents for the mitigation and restoration of Upper Penitencia Creek at the future site of the Berryessa BART station and campus. Mitigation and restoration design is needed to offset impacts related to extension of BART to San Jose. The project offers a unique [...]

Upper Penitencia Creek Mitigation and Restoration Design for BART to San Jose2019-03-15T22:47:36+00:00

South San Ramon Creek Stream Maintenance

As part of an updated stream maintenance plan for the City of San Ramon, Balance Hydrologics assessed the geomorphic conditions of South San Ramon Creek and its tributaries. Our effort concentrated on evaluating the existing channel roughness conditions in relation to those used for recent flood capacity calculations. We found that several segments of [...]

South San Ramon Creek Stream Maintenance2020-10-02T20:41:48+00:00

Elizabethtown Meadow Trail and Drainage Restoration

In 2011, Balance Hydrologics completed a watershed assessment of the larger Martis Creek watershed which identified priority restoration and re-naturalization projects related to meadow restoration, channel stability, habitat enhancement, groundwater recharge, water quality improvements, flood control, and recreation.  Elizabethtown Meadow, a discharge-slope wetland and formerly a short-lived mining town that existing in 1863, has [...]

Elizabethtown Meadow Trail and Drainage Restoration2018-07-12T16:58:44+00:00

UC Davis Tahoe City Field Lab Stream and Wetland Restoration Design

Balance Hydrologics provided the conceptual and construction-level channel and wetland restoration designs for the UC Davis Tahoe City Field Lab Restoration Project. The field lab is a former fish hatchery in Lake Forest, California, and is surrounded by Polaris Creek and its associated wetlands, including an abandoned spring-fed hatchery pond. The riparian wetland system [...]

UC Davis Tahoe City Field Lab Stream and Wetland Restoration Design2018-07-12T16:59:44+00:00

Upper Truckee Marsh Restoration Design

Beginning in the 1800s and continuing through intense land development in the 1960s and early 1970s, the Upper Truckee River was channelized through Lake Tahoe’s largest delta and marsh complex, which resulted in most of the marsh being dewatered, eroded, or obliterated. In an effort to preserve functioning areas and restore the sediment and [...]

Upper Truckee Marsh Restoration Design2020-11-02T18:27:04+00:00