1D-Model

Yerba Buena Pedestrian Bridge Design

Yerba Buena Creek, in the Evergreen neighborhood of San Jose, has become deeply incised, likely beginning near 1968, which correlates to when suburban development began in the watershed. As part of a Project team including Jacobs Engineering and Callander Associates, Balance collaborated on the design of a pedestrian bridge replacement over the creek that [...]

Yerba Buena Pedestrian Bridge Design2020-04-23T17:41:23+00:00

CSA 50 Flood Control Plan

Balance Hydrologics was the lead for an inter-disciplinary team that was selected to prepare an updated flood control plan for the Carmel River in County Services Area 50, which encompasses the north overbank areas of the river from Mission Fields upstream to Val Verde Drive in the County of Monterey, California.  The study included [...]

CSA 50 Flood Control Plan2020-04-23T16:20:15+00:00

Upper Penitencia Creek Mitigation and Restoration Design for BART to San Jose

Balance Hydrologics was retained to prepare a complete set of construction documents for the mitigation and restoration of Upper Penitencia Creek at the future site of the Berryessa BART station and campus. Mitigation and restoration design is needed to offset impacts related to extension of BART to San Jose. The project offers a unique [...]

Upper Penitencia Creek Mitigation and Restoration Design for BART to San Jose2019-03-15T22:47:36+00:00

Elizabethtown Meadow Trail and Drainage Restoration

In 2011, Balance Hydrologics completed a watershed assessment of the larger Martis Creek watershed which identified priority restoration and re-naturalization projects related to meadow restoration, channel stability, habitat enhancement, groundwater recharge, water quality improvements, flood control, and recreation.  Elizabethtown Meadow, a discharge-slope wetland and formerly a short-lived mining town that existing in 1863, has [...]

Elizabethtown Meadow Trail and Drainage Restoration2018-07-12T16:58:44+00:00