Riparian Restoration

Upper Truckee Marsh Restoration Design

Beginning in the 1800s and continuing through intense land development in the 1960s and early 1970s, the Upper Truckee River was channelized through Lake Tahoe’s largest delta and marsh complex, which resulted in most of the marsh being dewatered, eroded, or obliterated. In an effort to preserve functioning areas and restore the sediment and [...]

Upper Truckee Marsh Restoration Design2020-11-02T18:27:04+00:00

Verdi CMAR Riverbed Restoration Design

The Nevada Department of Transportation has classified two bridges along Interstate 80 as scour critical, and has contracted Granite Construction on a Construction Manager at Risk (CMAR) basis to design and implement a scour protection plan. Balance worked in concert with Wood Rodgers to fulfill environmental permitting requirements for the project, including development of [...]

Verdi CMAR Riverbed Restoration Design2018-01-16T23:47:51+00:00

Stanford University Hydrologic Support

Balance staff have been conducting a wide-range of hydrologic and hydraulic studies for Stanford University, the Stanford Lands Company and their cooperators in watershed management since 1994. Among these efforts have been: Searsville Dam and Reservoir Alternatives Study, Stanford University, San Mateo County, California. Geomorphic and hydraulic feasibility of various possible alternatives for Searsville [...]

Stanford University Hydrologic Support2022-04-14T16:44:50+00:00